- Farms, S&L_10/13/2023 26.13.06.300.701.729.004 S&L Farms 810 N 550 E 198,Agricultural Build Lease Land CENTER 19Y0 60/30
General Information Plumbing Cost Ladder
Occupancy Steel Grain Bin # TF Floor Constr Base Finish Value Totals
Description Steel Grain Bin Full Bath 1
Story Height 0 Half Bath 2
Style N/A Kitchen Sinks 3 -
Finished Area Water Heaters 4 ��
Make Add Fixtures 114 �`1\
Floor Finish Total 1/2 cb
°Earth OTile C)1: 3/4
°Slab °Carpet Accommodations (// / °}" Attic
°Sub&Joist °Unfinished Bedrooms Bsmt
°Wood °Other Living Rooms Crawl
°Parquet Dining Rooms Slab
Family Rooms1.)\1 Total Base
Wall Finish Total Rooms h Adjustments Row Type Adj.
°Plaster/Drywall ['Unfinished \ Unfin Int(-)
['Paneling ['Other Heat Type . \• \te..11, Ex Liv Units(+)
°Fiberboard
Rec Room(+)
Roofing / Loft(+)
°Built-Up °Metal °Asphalt °Slate °Tile ( C Fireplace(+)
°Wood Shingle °other No Heating(-)
NC(+)
Exterior Features No Elec()
Description Area Value Plumbing(+1 )
Spec Plumb(+)
Specialty Plumbing Elevator(+)
Description Count Value Sub-Total,One Unit $0
Sub-Total,1 Units
Exterior Features(+) $0 $0
e—\(( i(( C ZS Garages(+)0 sqft $0 $0
Quality and Design Factor(Grade)
Location Multiplier 0.93
Replacement Cost $116,072
Summary of Improvements
Description Res Story Construction rade Year Eff = Co Base LCM Adj Size RCN Norm Remain. Abn PC Nbhd Mrkt Improv
Eligibl Height Built Year Ag= nd , Rate Rate Dep Value Obs Value
1:Steel Grain Bin 0% 1 2012 2012 11 ' I 0.93 54'x 39'/I $116,072 35% $75,450 0%100% 1.0000 1.0000 $75,500
N. ,,
Ii/.I
i)‘ ' I (r , r
r (.(jc
(17
/- 1(ft 0
J
\,p(fr ,
9 0
..01)\
Total all pages $75,500 Total this page, $75,500